Fullarton Dam Class Environmental Assessment
The ÌÇÐÄÖ±²¥ (UTRCA) is undertaking a Class Environmental Assessment study to determine the course of action for Fullarton Dam in West Perth.
Fullarton Dam
- Location: 3000 Perth Rd. 163, Fullarton, ON, N0K 1H0
Virtual Public Meeting (March 28, 2024)
- Public Meeting Presentation (posted March 18, 2024)
- Notice of Virtual Public Meeting, March 28, 2024 (posted March 18, 2024)
- Meeting Recording:
Notice of Intent
- Fullarton Dam Environmental Assessment – Notice of Intent (Aug. 28, 2023)
Environmental Study Report
- Fullarton Dam Environmental Study Report (2025)
- Appendices A and B: Baseline Geomorphological Characterization Report; Key Background Documentation
- Appendices C, D, and E: Environmental Inventory / Existing Conditions; Dam Safety Report – Gap Analysis ; Cultural Heritage Report
- Appendix F: Stage 1 Archeological Assessment
- Appendix G: Consultation Materials
The following reports form the foundation from which evaluations of alternatives will be completed:
- Fullarton Embankment Stability Assessment (2006)
- Fullarton Dam Safety Assessment (August 2007)
- Fullarton Existing Conditions (2017)
- Appendix A: Fullarton Dam Hydrotechnical and Geotechnical Review
- Appendix B: Hydrogeology Assessment of Fullarton Conservation Area
- Appendix C: Fullarton Pond Water Quality Assessment
- Appendix D: Fullarton Dam Area Fish and Benthic Records
- Appendix E: Fullarton Dam and Conservation Area Vegetation and Bird Inventory
- Cultural Heritage Existing Conditions and Preliminary Impact Assessment (2022-2023)
- Natural Heritage Baseline Existing Conditions Report (2022-2023)
- Stage 1 Archaeological Assessment (2022-2023)
Contact
Jillian Smith, Water Control Structures Technologist, UTRCA (519-451-2800 x 320)